Process Cost
Smart VS Conventional Machine


Part thickness (mm):
Part surface dimension (sqm):
Annual volumes / part:

PART FINAL COST:
Number of molds / annual volumes SMART:
Number of molds / annual volumes TRADITIONAL:
Production configuration
24 hours
5 days
44 weeks
Smart configuration
Nº 4 (2+2) molds - mold change option
Conventional machine configuration
2.2 m swing arm
Nº 4 arms
Nº 4 molds/arms
TOT: 16 molds/machine
Material
LPE
€ 2/Kg
Part final cost includes
Machine depreciation cost (7 years)
Energy consumption
Labor cost
Raw material cost